Installing new MSB panels to replace existing panels at pump station
Supplying, installation, testing & commissioning:
Supplying Phoenix Contact’s PLC (ILC 151 ETH), HMI, Schneider’ Softstarter,
Murrelektronik devices, Schneider ‘s Switch gears…
Programming for PLC & HMI
Factory Acceptance Test (FAT)
Installing electrical cabinets
Doing electrical connection from field devices to cabinets
Site Acceptance Test (SAT)
Training for operators
Documenting: Hard copy & Soft copy (As-build drawings, Operation manuals, Training manuals…)